Property Details

Top Quality 3 Bedroom Pool Villa Close to Hua Hin Center for Sale (Off-Plan and Under Construction) - Hin Lek Fai, Thailand
1 / 15

Hin Lek Fai, Hua Hin, Thailand

Luxury 3 Bedroom Villa Hin Lek Fai Hua Hin for Sale

฿8,973,000

Ref: HSH0918-P

3

Beds

3

Baths

248

m²

About This Property

This is a new luxury pool villa project in one of the best areas of Hua Hin, surrounded by nature and offering views of Hin Lek Fai Mountains. Even though it's just 4 kilometers from Hua Hin city, it feels like an escape from city life, with plenty of tranquility and beautiful scenery. The first phase covers an area of 35.3 Rai (57,200 sqm) with 62 plots. The project prides itself on top-quality construction and materials, including piling, ring beam, and Q-con thermal blocks. The land comes with a Chanote title deed, the best in Thailand. Nearby, there are many good restaurants, both Thai and Western, as well as shops and a local market. Key features of the villas include: Fully equipped built-in European kitchen Built-in wardrobes in bedrooms Private swimming pool with a saltwater system (9 x 4 m) Large covered terrace with ceiling fans and exterior wall lights High ceilings (3.4 m) with interior ceiling fans in the living room Thick outside walls (20 cm) with Q-con blocks for heat insulation and noise reduction High-quality Bluescope roof frame with 20 year warranty, and tiles with insulation foil UPVC windows & doors with 6 mm thick glass for noise and heat reduction High-quality acrylic emulsion paints - fungus resistance, high durability in tropical weather conditions Double carport with an EV charger Underground pest control piping system Underground reserve water tank (4000 Liter) Air conditioning units in every room Sanitary ware and appliances in bathrooms Water heater (150 Liter) and high-power water pump (Mitsubishi) Automatic front gate with safety sensor Some key points: Full Chanote title deed (Freehold ownership), also available for leasehold for foreign buyers Low Common fee (2.5 Baht per sqm) for communal garden, security, garbage collection, and road maintenance The developer offers 4 different types of 2 and 3 bedroom villas. This type is 3 bedroom 3 bathroom villa (248 sqm living area). Other types of villa designs, Type B 2 bedroom (218 sqm living area) Type D 3 bedroom (285 sqm living area) Type L 3 bedroom (303 sqm living area) Loose furniture package is available at: 360,000 Baht for Boutique Villa 450,000 Baht for Premium Villa 455,000 Baht for Deluxe Villa 510,000 Baht for Luxury Villa. The project is only 10 min to town and 15 min to Black Mountain/Hua Hin International School. Perfect for family residence and investment.

Features

24 Hour SecurityAirconditioningCommunal FacilitiesEuropean KitchenFurnishedGarden AreaGarden viewKitchenPartially AirconditionedPool view

Hin Lek Fai, Hua Hin, Prachuap Khiri Khan, Thailand

Listed 26 July 2025
Share:

Agent

Thai Nexus Residency

Ref: HSH0918-P

Request Viewing

Specs

3 Bedrooms
3 Bathrooms
248 m²